Precast Concrete Wastewater Treatment Plants


Engineering •Fabrication •Installation




Home

Stress Key

Rib Wall

Projects

Lift Stations

Tertiary Filters

Denitrification

Mechanical Equipment Packages

Wastewater Treatment Equipment

W.W.T.P. FAQ

Mar-Wood
8501 N 75th Avenue
Peoria, AZ 85345
Tel: (623) 486-9445
Fax: (623) 486-9448
info@mar-wood.com

Contractors Licenses:
AZ#082818
NV#0028805
NM#055331
Industries Served:

•Housing Developments•Apartment Complexes•Casinos•Summer Camps•
•Military Bases•Campgrounds•Rest Stop Areas•Cities•City Parks•
•Prisons•Shopping Centers•Truck Stops•Schools•Bowling Alleys•
•Trailer Parks•Hotels•Resorts•Agriculture•Manufacturing•

Click the pictures for a larger view.

0.025 MGD “Rib Wall” Denitrification Wastewater Treatment Plant with, Filtration & Disinfection.


0.50 MGD above grade “Stress Key” Wastewater Treatment Plant with Filtration Disinfection designed for expansion to 1.0 MGD.

0.60 above grade “Stress Key” Wastewater Treatment Plant with Flow Equalization, dual Clarifiers & Disinfection.

0.06 MGD “Stress Key” Denitrification Wastewater Treatment Plant with Filtration, Disinfection & Aluminum covers for Odor Control.

Dual Train 0.30 MGD “Stress Key” Denitrification Wastewater Treatment Plant with Fiberglass covers for Odor Control.

0.06 MGD “Stress Key” Denitrification Wastewater Treatment Plant with open basins & aluminum handrail.


Sewage Treatment Plants
Lift Stations • Tertiary Filters • Denitrification
Mechanical Equipment Packages